SS4: data-independent lead-paper draft (G4+RQ1+RQ2), written blind
docs/stage-07-paper-draft.md — Abstract skeleton, Intro (consent-gate novelty G4 + RQ1 bridge-leak / RQ2 funnelling motivation), Related Work, full Methods from the frozen prereg §2-§6, Limitations §7, References. Results/Discussion are HELD-BLIND placeholders (battery still running, zero confirmatory numbers seen); RQ2 subsections additionally gated on the pending posterior-construction ratification. Frozen prereg untouched; no RQ2 statistic computed. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
@@ -45,3 +45,5 @@ NEEDS-OPERATOR: How is the RQ2 per-circuit adversary sender-posterior constructe
|
||||
- 2026-07-20 OVERSEER RULED DIRECTION=A (fill the gap, reject B/C). DRAFTED docs/stage-05-rq2-posterior-clarification.md — PROPOSED (operator-ratification PENDING), blind pre-spec (battery still running, ZERO RQ2 numbers computed). Rule: adversary observes exit-bridge/house → uniform posterior over the observation-consistent anonymity set A_i → per-circuit H_i=MM(log2 m_i) [Serjantov2002 S=2^H, Diaz2002 d=H/log2 N]; makes RQ2-P1 (ΔH, two-sided) + RQ2-P3 (Spearman) computable OFFLINE from per_circuit_seeds + deterministic assemble(). Grounded in cited lit only; sign not presumed; frozen prereg untouched.
|
||||
- HARD HOLD honored: no RQ2 confirmatory statistic computed/inspected/reported until Andre ratifies. RQ1 loader ready; SS4 skeleton next (data-independent). Battery: 442→ /9000 circuits, RUNNING, healthy.
|
||||
- BATTERY MONITORING CAVEAT (for the loop): the SS2 launch wrapper reported a benign exit-1 (a trailing `echo > .current-ts` error) — the battery itself is VERIFIED HEALTHY and progressing (spot-checked 66→69 circuits/25s, docker hops cycling, python PID 2539198 alive under wrapper 2539195). Because that background task is now closed, COMPLETION WILL NOT AUTO-NOTIFY. Detect completion by: `output/sor-confirmatory/20260720T060132Z/confirmatory-data/battery-results.json` present AND hop0.pcap count == 9000 (currently ~69). Do NOT re-launch (would duplicate/waste progress). Resume SS3 analysis (post-blinding) only after completion + the RQ2 ruling.
|
||||
- 2026-07-20 SS4 (data-independent draft) DONE + committed: docs/stage-07-paper-draft.md — lead paper (G4+RQ1+RQ2). Written BLIND (battery still running, zero confirmatory numbers seen): Abstract skeleton, Intro (G4 consent-gate novelty + RQ1 bridge-leak / RQ2 funnelling motivation), Related Work (onion/SOR [Egners2012], correlation [NasrBH18/OhYMH22], anonymity metrics [Serjantov2002/Diaz2002], social-trust G4 neighbours), full Methods from frozen prereg §2-§6 (design matrix, DVs, R=30×C=50, frozen detectors + §5 gate, Holm family=7 report-4), Limitations from §7, References. Results §5 + Discussion §6 = HELD-BLIND placeholders; RQ2 subsections additionally RATIFICATION-GATED (posterior proposal pending). No prereg edit; no RQ2 number.
|
||||
- DRIVE STATE: SS1 ✅ SS2 firing ✅ SS3-RQ1 ✅ RQ2-proposal ✅ SS4-skeleton ✅. Battery: 492/9000, RUNNING healthy (PID 2539198). REMAINING GATES: SS3-RQ2 + RQ1-P2 pairing on Andre's RQ2 ratification; SS4 Results/Discussion + SS5 review on (a) battery completion (blinding) AND (b) RQ2 ratification. All data-independent overnight work now exhausted without fabricating or breaking blinding.
|
||||
|
||||
Reference in New Issue
Block a user